Double P Intelligent Product Co., Ltd. logoDPI GROUP
Contact us

Plan around the whole site

Trace a working cycle before selecting cameras, networking, cooling or robots. Keep observation systems distinct from machine control and agree trials with operations. The illustration is a site concept, not a safety design or installation record.

Explore each area

Point, tap or use the keyboard to choose an area and see its systems and site checks.

Concept industrial plan showing receiving, storage, production and packing

Receiving

Coordinate vehicle arrivals, receiving checks and event records.

What to check

  • Review pedestrian separation, queuing space and turning movements.
  • Trial plate capture and receiving views under actual lighting.
  • Define vehicle authorisation and network-loss procedures.

AI-generated settings and layouts illustrate system planning. They are not DPI project photographs or installation drawings.

Prepare for the survey

  • People, vehicle and goods flows across shifts.
  • Loads, pallets, carts and transfer points.
  • Aisle widths, floors, slopes and door crossings.
  • Dust, moisture, heat and interference conditions.
  • Structures, power, racks and inter-building cable routes.
  • Downtime windows, system owners and failure procedures.

Agree how the system is accepted

  • Test connectivity at agreed workpoints and shelf conditions.
  • Check representative camera events and recording retrieval.
  • Trial robot routes with agreed loads, handovers and supervision.
  • Verify airflow and paging operation against the agreed design.
  • Deliver test records, as-built information, accounts and maintenance responsibilities.

From the site to an operable system

  1. Observe the workflow

    Follow goods through a working cycle and collect operational constraints.

  2. Design the trial

    Define interfaces, system boundaries and observable acceptance criteria.

  3. Pilot a defined area

    Trial a defined area before expansion, with stop and fallback procedures.

  4. Roll out and hand over

    Install around planned downtime, verify together and train shift teams.

Before planning the system

Can robots use every aisle?

Trial floor conditions, clearances, obstacles, loads and shared pedestrian use. Having sensors does not establish route suitability.

Can thermal cameras replace fire alarms?

Thermal cameras support defined observation tasks; fire detection and notification need a separate building and system review.

Can one cable type cover the whole site?

Assess distance, interference, outdoor routes and endpoints. Different cables or fibre may be appropriate, with agreed link testing.

Bring your plans to DPI

Share your site, existing systems and priorities so we can assess the project scope together.

Discuss your site